Emergency number

+48 32 76 27 333

Information about A4Go

+48 32 76 27 335 +48 32 76 27 535

19 March - start of works connected with a surface replacement between Rudno and Chrzanow on the carriageway to Katowice

16 03 2017 #New

Please be informed that on 19 March works connected a with surface replacement will start on the carriageway to Katowice between Rudno and Chrzanow Jucntions on the section of 4 km (from km 380 to km 376). There will be a speed limit to 80 km/h.

Still there will be two lanes in each direction during the replacement works.On the carriageway to Katowice one lane will be opened and on the carriageway to Krakow there will be two lanes in Krakow direction and one lane in Katowice direction, however due to works on traffic organsation changes:

  • on 19 March from evening hours till 6 AM the next day on the carriageway to Krakow there will be one lane on the section of 400 meters with a speed limit to 80 km/h,
  • on 20 March from 7 PM till 7 AM the next day on the carriageway to Krakow there will be one lane on the section of 500 meters with a speed limit to 80 km/h,
  • on 21 March from 6 PM till 7 AM the next day on the carriageway to Krakow there will be one lane on the section of 500 meters with a speed limit to 80 km/h.

Replacement works between Rudno and Chrzanow Junctions are to be completed till 27 April.