Surface replacement - update/ surface repairs
Please be informed that due to surface repairs and due to modernisation of a sewage system there will be one lane as follows:
1 April
- on the carriageway to Krakow between Brzeczkowice junction and the toll plaza in Myslowice, km 349, on the section of 1 km
- on the carriageway to Krakow behind the toll plaza in Myslowice, km 351, on the section of 300 m - in the morning hours
3 April
- 8 AM - 8 PM on the carriageway to Katowice, km 399 (behind the toll plaza in Balice) - 100 meters
- 4 - 7 PM on the carriageway to Krakow, km 372 - 373 (behind Chrzanów junction) - 700 meters
4 April, 8 AM - 4 PM
- on the carriageway to Krakow, km 373 (near Chrzanow junction) - 100 meters
8 April, 9 - 12 AM
- on the carriageway to Krakow, km 372 - 373 (behind Chrzanów junction) - 700 meters
Please be also informed that a surface replacement is being carried out on the carriageway to Katowice between Rudno and Chrzanow junctions on the section of 4 km (from km 380 to km 376). There is a speed limit to 80 km/h.
1 - 2 April
- short time narrowings to one lane on the carriageway to Krakow. Speed limit to 80 km/h.
3 or 4 April 9 - 9.30 AM and 4 or 5 April 4 - 5.30 PM (depending on the weather conditions)
- one lane to Katowice with a speed limit to 80 km/h
Afterwards there will be two lanes in each direction with a speed limit to 80 km/h. On the carriageway to Katowice one lane is opened and on the carriageway to Krakow there are two lanes in Krakow direction and one lane in Katowice direction. however due to works on traffic organsation changes:
Replacement works between Rudno and Chrzanow Junctions are to be completed till 27 April.
We apologise for any inconveniences and ask for careful driving.