Emergency number

+48 32 76 27 333

Information about A4Go

+48 32 76 27 335 +48 32 76 27 535

Surface replacement at the Balin junction in Chrzanow/ other works

27 06 2018 #New

SEWAGE SYSTEM MODERNISATION

Please be informed that due to sewage system modernisation on 28 June from 5 to 8 pm there will be only one lane on the carriageway to Katowice, c.a. 4 kilometers before the toll plaza in Myslowice at the section of 400 meters.

SURFACE REPLACEMENT ON SLIP AND ENTER ROADS AT THE BALIN JUNCTION IN CHRZANOW

Please be informed that a surface replacement is being carried out at the Balin junction in Chrzanow (km 369). Till the second half of August 2018 slip and enter roads of the junction will be closed and traffic will be carried on roundabout ways.

Closed roads:

  • half of Balinska street. There is a pendular traffic with traffic lights.
  • slip road direction Oświęcim/ Balin – Katowice (till evening on 27 June)
  • slip road direction Kraków - Oswiecim/ Balin

Please pay special attention to road signs.

SURFACE REPLACEMENT AT CAR PARKS NEXT TO TOLL COLLECTION PLAZAS

Please be informed that to 9 July there will be surface replacement at car parks located next to toll plazas in Myslowice and Balice - less parking space.

Other works

On 28 June and from 2 to 5 July, from 6 to 10 pm there will be only one lane at the different section of the motorway (local surface repairs).

Modernisation of rest area in Morawica

Please be informed that the rest area in Morawica (about 2 kilometers before the toll plaza in Balice, Krakow direction) is being redeveloped. Fuels are still on sale, but gastronomic services and other sales are limited, except for hotel services. On behalf of PKN Orlen - the operartor of rest areas - we apologise for inconveniences.