Surface replacement at the Balin junction in Chrzanow/ other works
SEWAGE SYSTEM MODERNISATION
Please be informed that due to sewage system modernisation:
- on 11 July from 5 pm till 12 July 1 am there will be only one lane on the carriageway to Katowice, c.a. 4 kilometers before the toll plaza in Myslowice at the section of 400 meters with a speed limit to 80 km/h
- on 12 July from 6 to 9 am there will be only one lane on the carriageway to Krakow, c.a. 4 kilometers after the toll plaza in Myslowice at the section of 400 meters with a speed limit to 80 km/h
SURFACE REPLACEMENT ON SLIP AND ENTER ROADS AT THE BALIN JUNCTION IN CHRZANOW
Please be informed that a surface replacement is being carried out at the Balin junction in Chrzanow (km 369). Till the second half of August 2018 slip and enter roads of the junction will be closed and traffic will be carried on roundabout ways.
On 12 July between 6 and 8 pm the slip road direction Kraków - Oswiecim/ Balin is going to be opened.
Closed roads:
- half of Balinska street. There is a pendular traffic with traffic lights.
- slip road direction Kraków - Oswiecim/ Balin
Please pay special attention to road signs.
Modernisation of rest area in Morawica
Please be informed that the rest area in Morawica (about 2 kilometers before the toll plaza in Balice, Krakow direction) is being redeveloped. Fuels are still on sale, but gastronomic services and other sales are limited, except for hotel services. On behalf of PKN Orlen - the operartor of rest areas - we apologise for inconveniences.