Works on the A4 motorway, section Katowice-Krakow
3
10
2019
#New
RESURFACING
Please be informed that due to resurfacing works:
- two narrowed lanes between the Jelen junction and the toll plaza in Myslowice at the section of 6 kilometers (km 358 - 352),
- at night on 3/ 4 October one lane on the carriageway to Katowice between the Chranow and Balin junctions (km 370),
- from September to November at the toll plaza in Balice temporarily one toll lane in both directions will be closed,
- two lanes in both directions at the toll plaza in Balice with a speed limit.
BRIDGES RENOVATIONS
- between the Rudno junction and the toll plaza in Balice (km 397 and km 389) two narrowed lanes in both directions with a speed limit to 60 km/h,
- Myslowice junction (km 347) two narrowed lanes in both direction
MODERNISATION OF SEWAGE SYSTEM between the Rudno and Chrzanow junctions.
We apologise for inconveniences and ask for careful driving.